The Supreme Court has stayed the Joint Commissioner’s order dated 17‑01‑2025 that imposed a 70:30 goods‑services tax split on a solar pumping system (SPG) EPC contract and held the High Court’s dismissal of the appellant’s alternate‑remedy claim improper. The matter will now be decided on the merits of tax liability.
The apex court intervened in a GST dispute involving a solar pumping system (SPG) engineering‑procurement‑construction (EPC) contract. The Joint Commissioner, on 17‑01‑2025, classified the appellant’s supply as a works contract involving immovable property and levied GST at a 70:30 split (5% CGST on goods, 18% CGST on services) together with penalties under Sec 122(2)(b) of the CGST Act. The High Court upheld that order and dismissed the appellant’s application for relief under an alternate remedy.
The Supreme Court stayed the Joint Commissioner’s order and held that the High Court’s dismissal was improper because the requirement of exhausting an alternate remedy is not a rigid rule. The Court will now determine the appellant’s tax liability on its merits (para 5‑6).
The dispute centres on the applicability of Notification 24/2018, effective from 01‑01‑2019, which introduced a 70:30 goods‑services split for SPG EPC contracts. While the notification is binding for contracts entered into after that date, Circular 163/19/2021 clarified that the split may be applied voluntarily to contracts completed before 01‑01‑2019, without any refund for tax previously paid at the uniform 18% rate. No statutory amendment makes the split mandatory retroactively.
Legal precedents on the definition of “immovable property” under Sec 2(119) CGST Act were cited. The functional‑intent test distinguishes permanent attachment to earth or a structure (immovable) from temporary fixtures such as nuts and bolts on shallow foundations (movable). Andhra Pradesh High Court decisions held that SPG systems attached to civil foundations are not immovable, whereas other cases (e.g., Siemens Gamesa) treated wind‑turbine towers as movable goods.
The Supreme Court set aside the Joint Commissioner’s orders dated 17‑01‑2025 and 24‑01‑2025 and ordered each party to bear its own costs. The Court emphasized that GST Council recommendations are implemented through notifications, not retroactive statutes, and that the 70:30 split is not automatically applicable to pre‑2019 contracts.
The case highlights the nuanced approach required to classify EPC contracts involving hybrid goods‑services supplies and underscores the limited scope of the alternate‑remedy exhaustion principle in tax litigation.
Key findings
- Exhaustion of an alternate remedy is not a rigid prerequisite for Supreme Court jurisdiction.
- Notification 24/2018’s 70:30 split is not retroactively mandatory; assessees may opt‑in for pre‑2019 contracts.
- The Joint Commissioner’s classification of the SPG supply as a works contract is stayed pending merits.
The outcome
Stay of Joint Commissioner’s order dated 17‑01‑2025; High Court dismissal set aside; matter to be decided on merits; each party to bear its own costs.
Statutory references
- Sec 2(119) CGST Act – definition of works contract
- Sec 122(2)(b) CGST Act – penalty provision
Paragraph references
para 5‑6 (stay and improper dismissal) · para 15‑20 (functional‑intent test for immovable property) · para 22‑24 (GST split and circular clarification) · para 35‑40 (final order and costs)